ARPA Park Improvements Survey Results
Share ARPA Park Improvements Survey Results on Facebook Share ARPA Park Improvements Survey Results on Twitter Share ARPA Park Improvements Survey Results on Linkedin Email ARPA Park Improvements Survey Results linkThank you to the 137 people who participated in our survey about ARPA Park Improvements! Your feedback will provide valuable guidance as we work to refine the designs to fit within our total project budget. We've already begun sharing the input back with the design teams and look forward to sharing updates as they become available.
You can check out the report here: https://www.jotform.com/report/23072609398105714
-
Lynn Harbor Park | Lynn Parque del Puerto
Share Lynn Harbor Park | Lynn Parque del Puerto on Facebook Share Lynn Harbor Park | Lynn Parque del Puerto on Twitter Share Lynn Harbor Park | Lynn Parque del Puerto on Linkedin Email Lynn Harbor Park | Lynn Parque del Puerto linkLearn more about the Lynn Harbor Park project.
-
McManus Park
Share McManus Park on Facebook Share McManus Park on Twitter Share McManus Park on Linkedin Email McManus Park linkProject Goals
The City requested a new all-weather, multi-use artificial turf field, field lighting, and skateboard park improvements. The budget was targeted at $5M.
Concept 1
The designers are considering three different concepts. All include two soccer and football fields, a baseball field, a softball field, an improved skate park, spectator seating, and a proposed building. The first concept proposes relocating the skatepark.
Concept 2
The second concept keeps the renovated skate park in its existing location, but creates more space for parking or practice space.
Concept 3
The third concept is similar to the first, but proposes a slightly different layout for the softball field.
Project Facts
Early Budget Estimate: $5.5M
Firm: Activas Landscape Architects
Objetivos del proyecto
La Ciudad solicitó un nuevo campo de césped artificial multiuso para todo clima, iluminación de campo y mejoras en el parque de monopatines. El presupuesto estaba destinado a $5M.
Concepto 1
Los diseñadores están considerando tres conceptos diferentes. Todos incluyen dos campos de fútbol y dos campos de fútbol, un campo de béisbol, un campo de sóftbol, un parque de patinaje mejorado, asientos para espectadores y un edificio de almacenamiento de campo propuesto. El primer concepto propone reubicar el parque de patinaje.
Concepto 2
El segundo concepto mantiene el renovado parque de patinaje en su ubicación existente, pero crea más espacio para estacionamiento o espacio adicional para práctica.
Concepto 3
El tercer concepto es similar al primero pero propone un diseño ligeramente diferente para el campo de softbol.
Hechos del proyecto
Estimación Presupuestaria Anticipada: $5.5M DÓLARES.
Firme: Arquitectos Paisajistas Activas -
Lynn Woods
Share Lynn Woods on Facebook Share Lynn Woods on Twitter Share Lynn Woods on Linkedin Email Lynn Woods linkProject Goals
The City requested a new playground, security lights, and a basketball court. The budget was targeted at $1M.
Proposed Concept
The proposed concept is under development; we will update this page once we have a draft available.
Project Facts
Early Budget Estimate: To come
Firm: CBA Landscape Architects
Objetivos del proyecto
La Ciudad solicitó que se mejorara el equipo del parque infantil y que se proporcionara accesibilidad ADA para el parque. La iluminación para la seguridad es una alta prioridad y la posible renovación de las canchas de baloncesto es una consideración. El presupuesto estaba destinado a $1M DÓLARES.
Concepto propuestoInformación adicional será próxima.
Hechos del proyecto
Estimación Presupuestaria Anticipada: POR DETERMINAR
Firme: CBA Arquitectos Paisajistas
-
Kiley Park
Share Kiley Park on Facebook Share Kiley Park on Twitter Share Kiley Park on Linkedin Email Kiley Park linkProject Goals
The City requested new fencing, an improved playground, signage, security lights, a renovation of the bathroom facility, masonry for the stairs, and a renovation of the clubhouse. The budget was targeted at $2M.
Proposed Concept
The proposed improvements include an ADA accessible path, a new restroom/concession facility, demolished fencing, treework and furnishings throughout the park, a relocation and improvement of the playground and installation of pickleball courts.
Project Facts
Early Budget Estimate: $900,000
Firm: Copley Wolff Design Group
Objetivos del proyecto
La Ciudad solicitó una nueva valla, un parque infantil mejorado, señalización, luces de seguridad y una renovación de las instalaciones del baño. El presupuesto estaba destinado a $2M.
Concepto propuesto
Las mejoras propuestas incluyen un camino accesible ADA, un nuevo baño / instalación de concesión, cercas demolidas, árboles y muebles en todo el parque, una reubicación y mejora del parque e instalación de canchas de pickleball.
Hechos del proyecto
Estimación Presupuestaria Anticipada: $
Firme: Grupo de diseño Copley Wolff
-
Keaney Park
Share Keaney Park on Facebook Share Keaney Park on Twitter Share Keaney Park on Linkedin Email Keaney Park linkProject Goals
The City requested the demolition of the clubhouse, new playground equipment and splash pad, and outside track, an irrigation system, and renovation of existing bathroom facilities. The budget was targeted at $5M.
Possible Concept
The designers considered multiple layouts to accommodate the scope of work, but ultimately decided to move forward with Concept A. Concept A includes ballfield drainage improvements, irrigation on all turf areas, a 3/4-mile track, the demolition of existing fence, playground improvements, a splash pad, a restroom and picnic area, treework, and new furnishings.
Project Facts
Early Budget Estimate: $3.5M
Firm: Copley Wolff Design Group
Objetivos del proyecto
La Ciudad solicitó la demolición de la casa club, el nuevo equipo de juegos infantiles y la plataforma de salpicaduras, y la pista exterior, un sistema de riego y la renovación de las instalaciones de baño existentes. El presupuesto estaba destinado a $5M.
Concepto posible
Hechos del proyecto
Estimación Presupuestaria Anticipada: $3.5
Firme: Grupo de diseño Copley Wolff
-
Breed Park
Share Breed Park on Facebook Share Breed Park on Twitter Share Breed Park on Linkedin Email Breed Park linkProject Goals
The City requested the installation of new lighting, upgrading existing lighting, new fencing, and improvements for the dugout and baseball fields and targeted a budget of $2M.
Proposed Improvements
The proposed improvements include refurbished fencing and bike racks, a new bleacher with ADA access, a refurbished ball field including a new dugout bench, irrigation and draining installation, refurbished batting cages, new score boards, and a restroom building. The design protects the existing basketball and tennis courts.
Project Facts
Early Budget Estimate: $3.4M
Firm: CBA Landscape Architects
Objetivos del proyecto
La Ciudad solicitó la instalación de nueva iluminación, la mejora de la iluminación existente, la nueva valla y mejoras para el dugout y los campos de béisbol, y apuntó a un presupuesto de $2M.
Mejoras propuestas
Las mejoras propuestas incluyen cercas y bastidores de bicicletas renovados, una nueva grada con acceso ADA, un campo de bolas reformado que incluye un nuevo banco de cascos, instalación de riego y drenaje, jaulas de bateo renovadas, nuevos tableros de puntuación y un edificio de baños. El diseño protege las canchas de baloncesto y tenis existentes.
Hechos del proyecto
Estimación Presupuestaria Anticipada: $3,4M DÓLARES
Firme: CBA Arquitectos Paisajistas
-
Gallagher Park
Share Gallagher Park on Facebook Share Gallagher Park on Twitter Share Gallagher Park on Linkedin Email Gallagher Park linkProject Goals
The City prioritized a new playground, a turf irrigation system, a pickleball court, and lighting for the basketball courts in the Gallagher Park renovations and targeted a budget of $1M.
Proposed Improvements
The proposed improvements are split into two phases. In the first, we will provide irrigation at all ballfields (1), we will create an ADA accessible path with lights and stairs (2, with possible 2a extension to Hurd St), we will renovate the baseball field (3) and softball field (4), and work with an arborist to conduct treework in the area.
In the second phase, we will make playground improvements (6), improve the courts (7), improve the entrance (8), install furnishings (9), and repair a retaining wall (10).
Destination Playground
As part of the phase 2 playground improvements, we're exploring creating play features with a signature element for ages 5-12 (1), play features for ages 2-5 (2), an embankment slide for ages 5-12 (3) and an embankment slide for ages 2-5 (4). We'll also have an ADA path to playground (5), park view swings (6), a nature play area (7), a picnic area (8), and a large-group picnic area that can accommodate birthday parties (9).
Project Facts
Early Budget Estimate: $2.3M
Firm: Copley Wolff Design Group
Objetivos del proyecto
La Ciudad priorizó un nuevo patio de recreo, un sistema de riego de césped, una cancha de pickleball e iluminación para las canchas de baloncesto en las renovaciones de Gallagher Park y apuntó a un presupuesto de $1M DÓLARES.
Mejoras propuestas
Las mejoras propuestas se dividen en dos fases. En el primero, proporcionaremos riego en todos los campos de béisbol (1), crearemos un sendero accesible ADA con luces y escaleras (2, con posible extensión de 2a a Hurd St), renovaremos el campo de béisbol (3) y el campo de softbol (4), y trabajar con un arborista para llevar a cabo el trabajo de árboles en el área.
En la segunda fase, realizaremos mejoras en el parque infantil (6), mejoraremos las canchas (7), mejoraremos la entrada (8), instalaremos mobiliario (9) y repararemos un muro de contención (10).
Patio de recreo de destino
Como parte de las mejoras de la fase 2 del patio de recreo, estamos explorando la creación de características de juego con un elemento distintivo para las edades de 5-12 (1), características de juego para las edades de 2-5 (2), un tobogán de terraplén para las edades de 5-12 (3) y un tobogán de terraplén para las edades de 2-5 (4). También tendremos un camino ADA al parque infantil (5), columpios con vista al parque (6), un área de juegos naturales (7), un área de picnic (8) y un área de picnic para grupos grandes que puede acomodar fiestas de cumpleaños (9).
Hechos del proyecto
Estimación Presupuestaria Anticipada: $2.3M DÓLARES.
Firme: Grupo de diseño Copley Wolff